Civil Estimation & Costing of 66 kV Switchyard

Learn Civil Estimation & Costing of 66 kV Switchyard using Excel & AutoCAD from ground zero.

Course Summary

This course includes: 

On demand videos
Downloadable resources
Access on mobile and TV


What you’ll learn

• Estimation & Quantity take-off using Excel & AutoCAD
• Costing calculation of estimated materials
• Bar Bending Schedule explanation at depth
• Construction Estimation of different materials/services
• Abstract sheet preparation along with specifications
• Download the Excel files & AutoCAD files used in the project
• Understanding the format of Estimation sheet
• All the documents and drawings used in the course will be available for download!

Course Description

This is a complete guide to Construction Estimation, Costing & Quantity Surveying of a complete 66 kV Switchyard with a Control Room.

We will go through AutoCAD drawings as well as Excel sheet for calculating the quantities and then deriving the final abstract sheet (costing) from the quantity take off.

• This course contains the following topics:
• Site Cleaning / Soil Filling
• Sand Filling Estimation
• Excavation Estimat•ion
• Switchyard Foundation Details & Measurements
• P.C.C.
• R.C.C. Estimation
• Reinforcement & Formwork Quantity
• Brickwork Quantity
• Plaster Quantity Estimation
• Flooring Estimation
• Fabrication
• Control Room Plans
• Bar Bending Schedule
• Compound Wall Estimation
• Abstract Sheet (Costing)
• Downloads / Resources

You will get a lifetime access to all these lectures, AutoCAD drawings and Excel Sheets whenever you want to revisit!

You can also obtain our certification of Master 0f Civil Estimation and Costing from our website where you will learn in very detail the different aspects of quantity takeoff and costing of various types of projects. You can also check out another of our courses where we have covered the civil estimation and costing of different projects in detail. You can also download the excel file of the estimation with all working formulas for reference or for other projects you wish to work on.

So what are you waiting for? Join the course now and start doing the Estimation, Costing & Quantity Surveying of various projects!!

Course Curriculum

Hokydemy

Course Pricing

Civil Estimation & Costing of 66 kV Switchyard

99 INR

  • Learn Civil Estimation & Costing of 66 kV Switchyard using MS Excel & AutoCAD from ground zero.

Buy Now